Files
falah-mobile/TODO.md
T
FalahMobile 61baf3ac5d chore: sync all local changes and new files
- Update next.config.ts
- Add netlify.toml, Docker configs, e2e tests
- Add env templates, docs (README, ROADMAP, TODO)
- Add vitest/playwright test configs
- Add component and lib tests
- Add install script, portainer env template
- Update .gitignore (tsbuildinfo, deno.lock, dev.db)
2026-07-02 20:01:48 +08:00

4.1 KiB

Falah OS v1.3 Production - Implementation Tasks

Phase 1: Core Infrastructure (Weeks 1-2)

Week 1: Database & Redis HA

  • Create docker-compose.ha.yml with PostgreSQL replicas
  • Set up streaming replication configuration
  • Configure pgBouncer for connection pooling
  • Set up Redis Sentinel for automatic failover
  • Configure Redis persistence (AOF + RDB)
  • Create backup script with S3/GCS upload
  • Set up automated daily backup schedule (cron)
  • Test failover scenarios

Week 2: Load Balancing & Service Mesh

  • Install Traefik/HAProxy
  • Configure SSL termination
  • Set up health checks for all services
  • Configure upstream routing
  • (Optional) Install Istio
  • Configure mTLS between services
  • Update docker-compose.yml with new infrastructure

Phase 2: Observability (Weeks 2-3)

Week 2: Metrics & Logging

  • Deploy Prometheus
  • Create service exporters (Node, PostgreSQL, Redis)
  • Build Grafana dashboards (system, API, business)
  • Deploy Loki for log aggregation
  • Implement trace ID propagation
  • Configure log retention policies
  • Set up error alerting

Week 3: Alerting & Tracing

  • Configure Prometheus Alertmanager
  • Set up notification channels (email, Slack)
  • Implement on-call rotation
  • Deploy OpenTelemetry collectors
  • Set up Jaeger for tracing
  • Document runbooks for common alerts

Phase 3: Security (Weeks 3-4)

Week 3: Secrets & Network

  • Deploy HashiCorp Vault
  • Configure dynamic database credentials
  • Migrate all secrets to Vault
  • Implement volume encryption
  • Deploy WAF (ModSecurity/Cloudflare)
  • Configure network policies

Week 4: Audit & Compliance

  • Implement immutable audit logging
  • Create transaction audit trail
  • Run dependency vulnerability scan (Trivy)
  • Scan all Docker images for CVEs
  • Conduct penetration testing
  • Document compliance controls

Phase 4: Reliability (Weeks 4-5)

Week 4: Disaster Recovery

  • Design multi-region architecture
  • Create DR automation scripts
  • Document RTO/RPO procedures
  • Test failover to DR region
  • Verify backup restoration

Week 5: Chaos & Resilience

  • Deploy Chaos Mesh
  • Create failure injection scenarios
  • Implement circuit breakers
  • Add retry with exponential backoff
  • Set up dead letter queues
  • Run first Game Day exercise

Phase 5: Performance (Weeks 5-6)

Week 5: Caching & Optimization

  • Integrate CDN (Cloudflare/Fastly)
  • Implement Redis API caching
  • Enable HTTP/2 on nginx
  • Configure response compression
  • Optimize PostgreSQL queries
  • Add indexes for common queries

Week 6: Load Testing & Launch

  • Write k6 load test scenarios
  • Run baseline performance tests
  • Conduct stress testing
  • Define performance budgets
  • Finalize SLA documentation
  • Production go-live

Documentation Tasks

  • Update architecture diagrams
  • Create deployment runbooks
  • Document API references
  • Write security policies
  • Create user guides

Testing Tasks

  • Unit tests for all services
  • Integration tests for API Gateway
  • E2E tests for critical paths
  • Performance benchmarks
  • Security penetration tests

New Features (If Time Permits)

  • Multi-tenant isolation
  • API versioning implementation
  • Webhook system
  • Plugin system design
  • Mobile SDKs (iOS/Android)

Dependencies

External Services Needed

  • S3/GCS bucket for backups
  • CDN provider (Cloudflare/Fastly)
  • Monitoring domain
  • SSL certificates (Let's Encrypt)
  • Email service for alerts (SendGrid/SES)
  • PagerDuty/OpsGenie for on-call

Tools Required

  • k6 (load testing)
  • Trivy (container scanning)
  • Chaos Mesh (chaos engineering)
  • Vault (secrets management)
  • Prometheus/Grafana (monitoring)
  • Loki (logging)
  • Jaeger (tracing)

Notes

  • All critical (P0) tasks must complete before production launch
  • P1 tasks should complete within 2 weeks of launch
  • P2 tasks are optional for v1.3
  • Review progress weekly with stakeholders